TUESDAY, JULY 18, 2006

Coming together

Wow. In two days, the painting is finished, the duct work is finished, the kitchen island is finished, the locks are finished, the windows are finished, and the shutters are almost finished. (I was responsible for those, which is why they are behind schedule.)

The walkway will be finished tomorrow at 6am, the blinds and last mattresses will be here tomorrow, the B&B sign and office lights should be here on Thursday, and the drapes, sheets, and towels should be here by Friday. We’ve hired two Amish ladies to clean, and have some friends coming over to help organize the furniture.

The Summer Kitchen plumbing and air conditioning is complete, the doors are ready to hang, the cabinets are hung, the wainscoting is set, the gas stove (fireplace) is installed, and the painting is almost complete. We should be able to set up the bed, day bed, and armoire tomorrow.

We still have to install window pulls, thermostats, and bathroom hardware, buy a coffee maker, and unpack all of our stuff from California, but it really is going to come together. Amazing.

Oh, and the best news: After a blistering week of temperatures in the high 90’s, the forecast for our grand opening this weekend is 81 on Saturday and 77 on Sunday.